Beyond the Delivery Blueprint: The Evolution of Modern Methods of Construction

04.11.26
Tom Mullens Director – Technical and Health & Safety, Australia
5 min read 2 min video

At its core, Modern Methods of Construction (MMC) is about achieving better outcomes. Better safety. Better working conditions. Better certainty. Better quality. Better productivity. More inclusivity.

It allows us to solve challenges earlier, manufacture in controlled environments, reduce risk on site and deliver complex projects with greater predictability. Just as importantly, it creates opportunities to rethink who can participate in our industry, opening pathways through manufacturing, digital engineering, technology and data-led delivery.

Over the course of my career, I've seen firsthand the difference this approach can make and the momentum it can build on a project for finding better ways to deliver.

Most recently, on the Swan River Crossings project in Western Australia, our team has brought together digital engineering, advanced offsite manufacturing and collaborative planning to deliver Australia's first extradosed bridge. Bridge segments were manufactured offsite, supported by detailed digital modelling, 4D simulations and physical trials before construction began. By shifting critical thinking and problem-solving upstream, the team improved quality, reduced risk and gave greater certainty to delivery. Watch this short video to take a first look at how we have brought this complex structure to life.

1

When I joined Laing O'Rourke as an under-graduate engineer more than 25 years ago, what struck me wasn't what the business was building, but how it was building.

Long before digital engineering, advanced manufacturing and offsite delivery became industry buzzwords, our founders, Ray and Des O'Rourke, were challenging traditional construction methods and asking a simple question: is there a better way?

That mindset is what first attracted me to the business, and it's why I'm still passionate about MMC today.

I have seen these principles at work across countless projects. A brilliant example was my first Australian project, Sydney’s Central Station Metro project. Delivering major new infrastructure beneath one of Australia's busiest transport hubs while keeping passengers moving demanded extraordinary planning.

What impressed me most was how thoroughly we challenged ourselves to solve problems before construction even began. The station roof structure was effectively built three times, first digitally, then offsite, and finally on site. That level of planning gave the team greater certainty, reduced risk and ultimately enabled a complex installation to be completed in just three 48-hour weekend possessions and a series of short night shifts, minimising disruption and enabling an incredibly complex installation to be executed safely and efficiently.

As part of the Eastern Freeway Burke to Tram Alliance (EBTA) in Victoria, Laing O’Rourke, together with Major Road Projects Victoria, Symal, Arcadis and WSP, is undertaking the first major upgrade of the Eastern Freeway since the 1990s. The team successfully installed the centre spans at Bulleen Interchange for three flyover bridges during three major weekend freeway closures, helping connect an upgraded Eastern Freeway to the North East Link tunnels.

While lifting bridge spans of 1080, 800 and 465 tonnes respectively, above a freeway servicing two hundred thousand vehicles a day, is an impressive feat, this approach has always been about maximising each freeway closure. Bringing teams together across civil, structures, engineering, safety, logistics and plant to deliver multiple work fronts at once has helped EBTA keep the broader program moving while minimising disruption for the community.

In another Australian first, on Princes Highway East Kilmany, to minimise the impact to the existing rail line and highway traffic, a 95 metre long network arch suspension bridge was engineered to be constructed “off-line” next to the rail line and then slid into its final position over the new road alignment to minimise disruption to the travelling public.

These benefits are not unique to Australia.

At The Grange University Hospital in the UK, extensive use of Design for Manufacture and Assembly accelerated delivery by 42 weeks, reduced on-site labour by 237,000 hours and enabled the hospital to open four months earlier than planned with zero defects.

At Oxford University's Stephen A. Schwarzman Centre for the Humanities, thousands of components were manufactured offsite before installation, improving productivity, and reducing disruption in a constrained urban environment.

Different projects. Different sectors. Different locations. Different Solutions. Yet the same lesson applies every time: the earlier we solve problems, the better the outcome.

For me, one of the most important benefits of MMC is safety. By moving work into controlled manufacturing environments and using digital engineering to optimise construction before activity reaches site, we can eliminate or reduce many of the risks traditionally associated with construction whilst shining a greater light on those that remain.

But the impact extends beyond individual projects.

MMC is helping reshape what a career in construction can look like. As our industry confronts skills shortages and increasing demand for infrastructure, we need to attract talent from the broadest possible pool. By creating opportunities across advanced manufacturing, digital delivery, engineering and technology, MMC is helping make our industry more accessible and more diverse.

That's particularly important when it comes to improving gender equality and creating pathways for people who may never have considered construction as a career. For me, that's one of the most exciting aspects of this transformation. We're not just changing how we build. We're changing who can build.

Looking ahead, Australia's opportunity is significant.

As Laing O’Rourke prepares to deliver major nation-building programs and large-scale infrastructure investments, we have a chance to create the certainty that allows businesses to invest in manufacturing capability, innovation and skills development at scale.

Those investments won't just improve individual projects. They can strengthen local industry, create high-value jobs and fundamentally improve how infrastructure is delivered for decades to come.

MMC isn’t about innovation for innovation's sake. It’s about using engineering, technology, manufacturing and human ingenuity to create better outcomes.

Twenty-five years ago, I joined a company that was asking different questions about how construction should be done. Today, I believe that mindset is more important and more present than ever.

Because the future of construction won't be defined by what we build. It will be defined by how we choose to build it.