One Hyde Park. London. UK

Client
Project Grande Limited
Sector
Buildings
Services
Building Construction Engineering ExpertiseModular ManufacturingSupport Services
Duration
2006-2011
Project partners
Candy & Candy, Rogers Stirk Harbour + Partners

Full project details

Remarkable and groundbreaking, a residential complex that exceeds all preconceptions of luxury.

The One Hyde Park project is remarkable and groundbreaking in many ways. The levels of innovation in engineering, as well as other areas of the build, emphasise our unwavering commitment to providing our clients with smart construction solutions.

This complex has set new luxurious standards worldwide. It has given Knightsbridge a distinctive new residential development that relates strongly to the existing streetscape. To reach the highest level of quality possible, the team adopted a collaborative approach, combining the skills and expertise of some of the best professionals in architecture, art, design and construction. The architect, Lord Rogers, remarked that the build quality was the finest he had seen anywhere in his 50-year career. One Hyde Park exemplifies Laing O’Rourke’s ‘total solutions provider’ capabilities with nine of our businesses involved in the design, build and fit-out.

A leap above the rest

The predominant construction techniques were based on offsite production of precast concrete components. By using these modern methods of construction, and creating detailed designs at a very early stage, we streamlined the construction process resulting in straightforward assembly on site. We used natural, organic materials and successfully worked to unusually tight tolerances and quality specifications. We used a combination of the best features of offsite production technology, together with skilled craftsmen on site, to overcome seemingly unworkable specification requirements and produce a project that surpasses all expectation.

Facilities and services beyond expectation

Security and privacy are leading themes in the design, and we worked with the developers and consultants to turn design into reality with as little compromise as possible. With 60 full-time staff, 24-hour room service, reassuringly high levels of security, underground valet parking, private spa, 21m ozone swimming pool, virtual golf simulator, private cinema, personal wine storage, squash court, state-of-the-art gym, and a business suite and meeting rooms, the design truly exceeds all expectation. The scheme also provides 139 vehicle and 114 cycle spaces across two basement levels.

Engineering excellence

A top-down construction approach meant building both up and down simultaneously from the ground floor slab – in this case the four-storey basement was excavated from below. This technique enabled significant time savings to be made in an extremely busy part of London. 

Environmental awareness

An anaerobic composter used during the temporary works enabled the recycling of onsite waste, reducing the amount sent to landfill. Concrete from the previous structural foundations was crushed on site and reused as part of the piling mat. It was estimated that this saved around 20 lorries per day coming to the site over a period of more than 100 days. 

We provided boreholes for ground source heating to minimise the use of individual gas/electric boilers within apartments. As this was decided at an early stage in the design, it was possible to minimise installation costs by integrating the 50m deep boreholes with the foundation piling. 

Intelligent logistics – crucial and flawlessly executed

At peak there were 2,000 people working on site and up to 200 vehicle movements per day. Materials movement was a serious challenge, as the building occupies 88% of its plot in a busy central London location. 

During the construction and fit-out period there was no possibility for onsite storage, and tight synchronisation of deliveries using just-in-time methods was essential. Our logistics solution was to set up a large, offsite construction consolidation centre (CCC). This central warehouse, located in Wembley, substantially reduced the traffic mileage and pollution discharge in central London, by having fewer, larger deliveries sent to site. Through the CCC we were able to inspect the quality of materials as they arrived, and once again as they were delivered on site. This gave us full control, reassuring our client that the highest level of quality was maintained throughout all aspects of the build.

Key successes of our logistics solution: 

  • The CCC resulted in a 66% reduction in vehicle movements
  • 93% of materials arrived at the CCC on time
  • 100% of materials arrived at the construction site on time
  • 100% of materials arrived in perfect condition
  • 97% of onsite waste was recycled
  • Greater control meant we delivered the highest quality possible 

Awards

  • International Property Award, Highly Commended Development 
  • NHBC Pride in the Job Awards for Quality, Seal of Excellence and the Regional Award
  • Commended at the PTA Post-tensioned Structure Awards

Project facts

World leading standards of luxury and quality

700,000ft² and 85 apartments

At peak, 2,000 people on site and 200 vehicle movements per day on a very congested Inner city site

97% of onsite waste was recycled

Our intelligent logistics solution reduced vehicle movements by 66%

One Hyde Park. London. UK

One Hyde Park. London. UK

One Hyde Park. London. UK

One Hyde Park. London. UK

One Hyde Park sculpture

One Hyde Park. London. UK

One Hyde Park interior fittings

It has set a new benchmark for residential schemes not just in London, but around the world.

Nick CandyCEO Candy & Candy

Featured projects

Al Bandar

Abu Dhabi. United Arab Emirates

Discover

Doubletree Hotel

London. UK

Discover

Tooley Street

London. UK

Discover

Cannon Place

London. UK

Discover
See all of our projects